Note
ECT Sensor Resistance Inspection
1. Drain the engine coolant. (See COOLING SYSTEM SERVICE WARNINGS.)
2. Remove the ECT sensor (located above the starter).
3. Place the ECT sensor in water with a thermometer, and heat the water gradually.
4. Measure the resistance between the ECT sensor terminals A and B using an ohmmeter.
Specification
Circuit Open/Short Inspection
1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION.)
2. Inspect the following wiring harnesses for open or short. (Continuity check)
Open circuit
- ECT sensor terminal A (harness-side) and PCM terminal 1M (harness-side)
- ECT sensor terminal B (harness-side) and PCM terminal 2H (harness-side)
Short circuit
- ECT sensor terminal A (harness-side) and power supply
- ECT sensor terminal A (harness-side) and body GND
- ECT sensor terminal B (harness-side) and power supply
Mazda 6 Service Manual: Declaration of Conformity
Keyless Entry System/Immobilizer System
Blind Spot Monitoring (BSM) System
NOTE
During printing time of this user manual the approvals listed above are granted.
WARNING
Change or modifications not expressively approved by the party responsible
for compliance could void the use's authori ...
Mazda 6 Service Manual: Filament repair
1. Use isopropyl alcohol to clean around the damaged section of the filament.
2. Attach tape above and below the damaged section of the filament.
3. Using a small brush or marking pen, repair the filament with silver paint
or equivalent.
4. After 2-3 minutes, carefully remove the tape without ...