Note
Resistance Inspection
1. Disconnect the CKP sensor connector.
2. Measure the resistance between CKP sensor terminals A and B using an ohmmeter.
Specification
400-550 ohms
Circuit Open/Short Inspection
1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION.)
2. Inspect the following wiring harnesses for open or short. (Continuity check)
Open circuit
- CKP sensor terminal A (harness-side) and PCM terminal 2D (harness-side)
- CKP sensor terminal B (harness-side) and PCM terminal 2G (harness-side)
Short circuit
- CKP sensor terminal A (harness-side) and power supply
- CKP sensor terminal A (harness-side) and body GND
- CKP sensor terminal B (harness-side) and power supply
- CKP sensor terminal B (harness-side) and body GND
Mazda 6 Service Manual: Ignition Switch
Push Button Start Positions
The system operates only when the key is within operational range.
Each time the push button start is pressed, the ignition switches in the order
of off, ACC, and ON. Pressing the push button start again from ON switches the ignition
off.
NOTE
The engine star ...
Mazda 6 Service Manual: Crankshaft position (ckp) sensor removal/installation
Removal
1. Perform the following procedure to making the working space.
(1) Remove the Front wheel (RH).
(2) Remove the splash shield.
2. Disconnect the CKP sensor connector.
3. Remove the installation bolts to remove the CKP sensor.
Installation
Caution
When foreign material such a ...