Note
Resistance Inspection
1. Disconnect the CKP sensor connector.
2. Measure the resistance between CKP sensor terminals A and B using an ohmmeter.
Specification
400-550 ohms
Circuit Open/Short Inspection
1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION.)
2. Inspect the following wiring harnesses for open or short. (Continuity check)
Open circuit
- CKP sensor terminal A (harness-side) and PCM terminal 2D (harness-side)
- CKP sensor terminal B (harness-side) and PCM terminal 2G (harness-side)
Short circuit
- CKP sensor terminal A (harness-side) and power supply
- CKP sensor terminal A (harness-side) and body GND
- CKP sensor terminal B (harness-side) and power supply
- CKP sensor terminal B (harness-side) and body GND
Mazda 6 Service Manual: Climate control unit inspection
Full-auto Air Conditioner
1. Connect the all center panel connectors.
2. Turn the ignition switch to ON position.
3. Measure the voltage at each climate control unit terminal and refer to the
terminal voltage list.
If not as specified, inspect the parts listed under Action and the
relate ...
Mazda 6 Service Manual: Main fuse removal/installation
1. Disconnect the negative battery cable.
2. Remove the main fuse block cover.
3. Remove in the order indicated in the table.
4. Install in the reverse order of removal.
Bolt Removal Note
1. Press and remove the tabs on the main fuse block at the positions
indicated by the arrows.
2. L ...