1. Install the SST
(gas charging set).
2. Disconnect the refrigerant pressure switch connector.
3. Verify the high-pressure side reading of the SST
(manifold gauge) and continuity between the terminals of the refrigerant pressure switch.
Triple-pressure Type



Dual-pressure Type


Refrigerant pressure switch removal/installation
Climate control unit removalMazda 6 Service Manual: Rear beltline molding removal
Note
When removing the rear beltline molding, the clip may be damaged.
If the clip is damaged, replace it with a new one.
1. Pull the A section upward and remove the clip.
2. Rotate the B section of the front beltline molding in direction (2), along
the direction (1) shown in the figu ...
Mazda 6 Service Manual: Clutch master cylinder disassembly/assembly
1. Disassemble in the order indicated in the table.
2. Assemble in the reverse order of disassembly.
Snap Ring Disassembly/Assembly Note
Hold the piston down using a cloth-wrapped pin punch.
If disassembling, remove the snap ring; if assembling, install it.
...